With a real “quick shot”, Hagelschuer was able to secure the delivery capability of the Eisleben plant of the Aryzta company. There, the failure of a heat exchanger with thermal oil (800 kg/h at 0.8 bar) had caused production bottlenecks. Hagelschuer implemented a replacement solution with the “Iris” rental boiler in just four days.

The task

At noon on Tuesday, the emergency call from Eisleben reached the Hagelschuer headquarters in Buldern. On the same day, the “Iris” 1,250 kg/h saturated steam boiler, as a compact unit with hose lines up to DN32 0.5-1.2 bar pressure reducer, could be offered as a solution. The order was placed on Wednesday morning. Hagelschuer started immediately with the conversion of the pressure reducer to the required downstream pressure.

Pictures of the rental boiler Iris

The attachment

On the same day, Iriswas loaded together with 30 m of DN 80 steam hoses and a 5 m³ fuel oil tank. On Thursday, “Iris” and its peripherals arrived in Eisleben, where they were assembled and refueled with fuel oil.

On Friday, the TÜV inspection and commissioning took place. Exactly four days after the emergency call, reliable steam supply for production was restored.

Thomas Hinrichs Project Manager Hiestand Deutschland GmbH

“Out of three companies we chose Hagelschuer, our requirements were met. We focus on operational safety and energy efficiency. Hagelschuer is a reliable partner.”

More references for steam generators in the food industry

Mietkessel Jule

Project partner mediates Jule before completion

Our rental boiler plant Jule (3 t/h, 2.1 MW, 16 bar) had not yet been completed when we received the first inquiry from our project partner CAL Trading from the Netherlands. A dairy plant for goat milk needs an additional process steam supply as a temporary solution for approx. 2 years for the expansion of its product range. The customer’s requirements were high; in addition to a fully equipped container facility, the customer also wanted the ongoing operating costs to be as low as possible.

Learn more

Harries Mühle

Harries Schälmühlenwerk GmbH & Co KG Harries Mühle – mobile energy center delivered as GH container plant Hagelschuer delivered a new fully equipped GH container

Learn more

SchapfenMühle

SchapfenMühle GH container plant installed on the roof as an energy center The tradition-conscious family business SchapfenMühle has a high quality awareness and demanding requirements

Learn more
KWK Anlage Brauerei Potts

Potts Brewery

For the Oelde-based specialty brewery Pott’s, Hagelschuer, together with the engineering office Hebmüller, took over the planning and implementation of a steam generator. Which can be used as a CHP plant in combination with a micro gas turbine.

Learn more
Mietkessel Soeren bei Franken Braeu

Franken Bräu

For the first time, Hagelschuer Rhein Main has installed a free-standing boiler plant from its inventory in a container unit.
For this purpose, the shell boiler was placed in a newly constructed High Cube container with transport dimensions of 9.30 x 2.65 x 3.05 m. The container is equipped with a special water heater.

Learn more